The cost of an industrial wind project depends less on the turbine price alone than on how much energy the site can produce over its life. Here is what drives the numbers.
Capital cost (CAPEX)
- Turbines: the number and size needed to meet your load.
- Foundations and mounting: rooftop, ground or mast installation.
- Electrical: inverters, protection, grid connection and optional storage.
- Assessment and engineering: wind measurement, structural checks and design.
Operating cost (OPEX)
Maintenance, monitoring and insurance. Non-lubricated bearings, a minimal-lubrication shape drive and remote monitoring keep this low.
Return on investment
Payback depends on the wind resource, your electricity tariff and how much of the energy you use on site. In good locations our micro wind farm projects target ROI in under 5 years for industrial sites and under 3 years for rooftop and highway installations.
You may not need to pay upfront
With an energy partnership, Lucent Drive builds, owns and operates the wind farm while you pay a lower price for the power. Green power purchase lets you buy clean energy each year with no infrastructure at all.
Get a figure for your site
Every site is different. Send us your location and energy use and we will prepare an assessment and proposal.